Al Othaim Palace
Year: 2014
Project Location: Riyadh
Project Scope: Supplied and installed GRC Elements, in addition supplied Interlocking pavers, Kerbstones, Terrazzo Tiles.
Project Duration: 2014 – 2015
A beautiful and sophisticated residential building constructed in Riyadh. 3000 sqm areas were installed GRC done within 18 months.