Projects
  • Jabal Omar Development Project

    Year: 2018

    Project Location: Makkah, Saudi Arabia
    Project Scope: Supply and Installation of GRC cladding.
    Project Duration: 2015 -  Ongoing Project


    On an area of more than two square kilometers, 40 towers are reaching for the sky. Run by 29 of the world’s top hospitality service providers, the hotel rooms and suites in these towers will host some 34,000 guests on any normal day, and up to a whopping 100,000 visitors on any given day during the Haj and Umra seasons. The standout features of the project are a pair of twin towers with a praying area directly connected with The Holy Mosque. Together, they boost pedestrian traffic along King Abdulaziz Road, which leads straight to the Haram, and provide a comprehensive set of shops and restaurants.   The third phase consists of two construction bases and four towers with a total built area of 398 thousand square meters. This phase includes 2166 hotel rooms comprising the twin towers, 1490 hotel rooms of which will be managed by Address Hotels & Resorts. 

    Read More

  • Riyadh Metro Project

    Year: 2018

    Project Location: Riyadh , Saudi Arabia
    Project Scope: Supplied and Installed GRC, GRG Cladding – in addition Interlocking pavers, Kerbstones, Terrazzo Tiles  and Precast Special Products.
    Project Duration: 2017 - Ongoing


    Riyadh Metro project represents a public transit system of 6 main lines covering 176 KM and 85 highly equipped stations with cutting-edge technology, which will offer you an outstanding experience during your trip around the city. These 6 lines cover most of the highly populated districts, government’s facilities, educational and commercials outlets. It is connected with King Khaled International Airport and King Abdullah Financial District, in addition to big universities, the city center and center of Public Transit. Riyadh Metro has 6 Lines divided into: (Blue Line) Olaya – Batha’a with 38 KM distance.  (Red Line) King Abdullah Road with 25.3 KM distance  (Orange Line) Al Madina Al Monawara – Prince Saad bin Abdul Rahman Al Awal road, 40.7 KM distance  (Yellow line) King Khaled International Airport Road, 29.6 KM distance  (Green line) King Abdul Aziz Road 12.9 KM distance  (Purple Line) Abdul Rahman bin Aouf road – Shiekh Hassan bin Hussain bin Ali road, 30 KM distance  ARTIC Project area's : Supply and Installation of GFRC Cladding and GFRG internal Decorative panels to Olay Station. Iconic Station Supply and installation of GFRG elements to Line 3 Station. Supply GFRC elements to Line 3 Station. Supply of Interlocking pavers, Terrazzo tile, Curbstones and Precast Concrete products.

    Read More

  • Saudi Electricity Company Headquarters

    Year: 2018

    Project Location: Riyadh
    Project Scope: Supplied and installed GFRG cladding, in addition supplied Interlocking pavers and Kerbstones.
    Project Duration: 2018 - Ongoing Project


    Representing a novel and custom approach to sustainable design and construction, the new Saudi Electricity Company Headquarters is intended to become a ground breaking landmark in the evolution of Riyadh’s Architectural history. The headquarters are seated in a state-of-the-art campus encompassing 265,000 square meters, with offices and amenities distributed across five interconnected buildings and the surrounding “wadi” garden landscape comprising one city block. The four cube-shaped office blocks are unified by a central podium volume at the center, which serves as the main reception and creates a social and functional heart for the company. The individual buildings house different departments and, viewed together, represent a coherent unity of organized parts. At the same time, the plan enables a great deal of flexibility to accommodate future growth and change. Scope of ARTIC products: Supply and installation of Glass fiber reinforced concrete (GFRG), different types of paving blocks, curbstones “

    Read More

  • Najran Water Tower

    Year: 2018

    Project Location: Najran –Saudi Arabia.
    Project Scope: Supply and install GFRC Cladding.
    Project Duration: 2018 One year.


    The project calls for the construction of water tower located in Najran Province, Najran, Saudi Arabia.

    Read More

  • Riyadh Shopping Interface - Shopping Front

    Year: 2018

    Project Location: Riyadh, Saudi Arabia
    Project Scope: Supply of Tile and precast concrete products
    Project Duration: 2018


    The project's scope of work consist of a shopping complex located at Riyadh, Saudi Arabia.

    Read More

  • Sakaka Water Tower

    Year: 2018

    Project Location: Al Jouf, Saudi Arabia
    Project Scope: Supply and Installation of GRC cladding.
    Project Duration: 2017 - 2018 (Ongoing Project)


    The project calls for the construction of water tower located in Al Jouf,  Saudi Arabia.

    Read More

  • Mohammed bin khalifa al khalifa cardiac center project

    Year: 2018

    Project Location: Awali, Bahrain
    Project Scope: Supply of Interlocking Pavers.
    Project Duration: 2017 -  Ongoing Project


    The project involves the construction of a 32,000m2, seven-story cardiology center comprising 148 beds on 44,000m2 of land in Awali, Bahrain.

    Read More

  • The East Hidd Housing Development project

    Year: 2018

    Project Location: opposite the existing town of Hidd, Bahrain.
    Project Scope: Supply of Interlocking Pavers.

    Project Duration: 2017 -  Ongoing Project


    The East Hidd Housing Development is coming up on reclaimed land off the east coast of the Bahrain opposite the existing town of Hidd.The project's scope of work involves the housing development is a residential development forming a new urban town on reclaimed land off the east coast of the Kingdom of Bahrain opposite the existing town of Hidd. The project's scope of work consists of 4,545 housing units comprising 2,827 villas, 1,212 apartments and 500 plots spread across a 232-hectare site.

    Read More

  • ARAR Water Tower

    Year: 2018

    Project Location: Arar, Saudi Arabia
    Project Scope: Supply and Installation of GFRC cladding.
    Project Duration: 2018 -  Ongoing Project


    The project calls for the construction of water tower located in Arar,  Saudi Arabia.

    Read More

  • Diplomatic Quarter Park project Riyadh

    Year: 2018

    Project Location: Riyadh, Saudi Arabia.
    Project Scope: Supply of Interlocking Pavers, Terrazzo Tiles and precast concrete products.
    Project Duration: 2016-2018.


    This Compound is located in Riyadh, in the diplomatic quarter, which serves as a home base for the embassies, international bodies, and quite a number of the governmental and civil bodies. Thus, the investment attitude of the Public Pension Agency (PPA) decided to establish this project to provide prestigious residential and commercial units going with the high-profile purposes of the diplomatic quarter.

    Read More

Top